Case Studies

Requirement: The supply of teams to clear litter on track and around stations. Teams consisted of one x ES/Coss & two PTS staff (the ES’s had to have third rail isolation competencies). The teams where located across 5 major stations in London. Transport, Labour, PPE, ES equipment (marker Boards, Straps etc), Litter pickers, bags, needle gloves & boxes all provided by Crewit. Location: London Bridge, Cannon Street, Charing Cross, Charlton and Greenwich. Date: 2012 – 2012

Requirement: The supply of Site Managers, Supervisor, Gangers, Coss, Look Out, Ground worker, De-veg ops, Skilled Ops (Shuttering and Steel Fixers) and Plant Operatives. The works carried out on site are route side civil associated, i.e. Troughing, Loc bases, Signal Bases, Gantry Bases, UTX’s, REB’s and Cable Pulling. Location: Swindon, Bristol, Poole and Billingshurst Date: 2012 – Current

Requirement: The supply of Ground workers to assist on a new canopy installation at 3 Bridges Station. The ground workers will be required to help break out exiting concrete, dig holes / foundations and lift and carry materials and equipment around site. Location: Crawley Date: 2012

Requirement: The supply of Electricians, Electricians Mates, Comms Technician’s, Coss and Ground workers . The work consists of the installation of a customer information display system and help points boxes, this involves ground works base and duct digging, conduit, trunking, Cat 5 terminations and new wiring. The teams have been provided with a Long Wheel Base Transit Van and Insulated hand tools such as Spades, Shovels and Picks. Location: West Hampstead to Luton Date: 2013